What are the Challenges in Testing Process?

0
354
Spread the love
  • 13
  • 23
  • 34
  • 12
  •  
  •  
  •  
  •  
  •  
  •  
    82
    Shares

To avoid timing issues,we can take at-least the high important test cases.(Something reviewed instead of none).

Second important process should be to involve everybody during story/requirement review time.An open discussion will bring down these issues.Reviewing the requirements in a passive mode can also resolve the issues.

Another successful approach is to use storyboards(informal sketches of the user interface, but not full fledged prototypes)

To treat over specification, the best approach will be to employ an experienced in human factors and user interface design and engage them as part of the team. This team will include the users,developers,testers.By using iterative model,iterative mode of discussion , team should make sure what is the best way to represent information.

Again a storyboard,outline of the use-case can be very good concept.We need to make sure that we are not stressing much on putting too much details about UI into use case description.

Use keywords like depends on,contains etc to shorten but meaningful representation.Use of proper wording can be one more mitigation plan plan. So it is best to use “User” instead of Priyanka in the story.

Putting a glossary can help in this situation.After putting glossary , we just need to link different definitions.

Just remember:
  • A high quality prototype(like real application) may reduce rapid feedback.
  • Too good prototypes will make the stakeholders mumps. So a draft outline is sufficient.

Lets start the feedback sessions early and have a lot of them.Quick 5-10 minutes session on a particular requirement often works better than huge 2-3 hours or full day session.

It is equivalent to continuous improvement rather than waterfall model of feedback.

Below are some tips and tricks:
  • Collect all the the documents and try to go through it to understand the goal of the requirements.
  • Join regular calls along with development team to understand the requirements better.
  • Voice out if you understood a piece of the requirement differently.
  • Understand the dependencies for the requirement. It will help you to test further in a speedy manner.
  • Prepare a requirement document or a story grooming documentation and get it verified by teams.
  • Remember information is king. You have to transform the available documents as a gold mine for the same.
  • Need an algorithm with an application if possible.
  • Define the terms used.Add glossary at the end.

What can be done if requirements are changing continuously?

  • Work with the executives to see how prerequisites may change, so exchange test designs and procedures can be worked out ahead of time. It is useful if the application’s underlying plan takes into consideration some versatility, with the goal that later changes don’t require re-trying the application starting with no outside help. Furthermore, attempt to guarantee the code is very much remarked with documentation and all around archived; this makes changes simpler for the designers.
  • Structure some adaptability into experiments; this isn’t actually done; the best wager is to limit the detail in the experiments, or set up just more elevated amount conventional sort test designs.
  • Concentrate less on point by point test designs and experiments and more on specially appointed testing with a comprehension of the additional hazard this involves.
  • Utilize quick prototyping at whatever point conceivable; this will enable clients to feel beyond any doubt of their prerequisites and limit changes.
  • In the project’s underlying timetable, consider some additional opportunity to similar with plausible changes.
  • Move new requirements to a ‘Stage 2’ form of an application and utilize the first prerequisites for the ‘Stage 1’ rendition.
  • Consult to permit just effectively executed new prerequisites into the venture; move increasingly troublesome, new necessities into future variants of the application.
  • Guarantee clients and the board management about the scheduling impacts, natural dangers and expenses of noteworthy prerequisites changes. At that point let administration or the clients choose if the progressions are justified.
  • Concentrate beginning computerized testing on application angles that are well on the way to stay unaltered.
  • Dedicate suitable exertion to chance examination of changes, so as to limit relapse testing needs.
  • Equalization the exertion put into setting up computerized or robotized or automated testing with the normal exertion required to re-try them to manage changes.
  • Plan some adaptability into computerized or automated test contents.
  • Communication plays a great role to clear some doubts. Do not hesitate to call up and discuss the grey areas. Communication can be of any type vertical,horizontal,upwards and downwards.
  • Once you get clarity correct the document and arrange for meeting to keep everybody on the same page.

What if the application has functionality that was not in the requirements?

It might require genuine effort to decide whether an application has critical startling or concealed functionalities, which it would show further issues in the product improvement process.

On the off chance that the functionality isn’t important to the reason for the application, it ought to be evacuated, as it might have obscure effects or conditions that were not considered by the creator or the client.If not expelled, structure data will be expected to decide included testing needs or relapse testing needs. The executives ought to be made mindful of any critical included dangers because of the sudden usefulness.

On the off chance that the usefulness just influences regions, for example, minor upgrades in the UI, it may not be a noteworthy hazard.
An issue in Software Testing challenges or DevOps Testing issues right?

Error in Implementation or tester’s miss:: role of tractability metrics

These are very frequent causing issues with agile development. In such case the concept and specification were right but the implementation was wrong.

It may be get caught during testing phase. It is easy to conclude that this is not requirement problem.But that is not sufficient. Right?In the first place there is no point of writing a requirement which is not useful at all.

Every requirement should have corresponding design doc and testcases to check it correctly. Traceability is very important.If we are not going to implement them correctly,there is no point to jot down the requirements. The traceability reduces the overhead of requirement testing.

Failure to test requirements usually arises from a resource problem.There are not enough people to test. There are not enough people to test the requirement.This situation is often referred as dysfunctional function of an organization. It is advisable that the team members should come out of the mode to give support to testing.

They must not become functional silo in their act. At the same time,management must not reduce test engineers and depends on development team to carry out testing.

Don't miss out!
Subscribe To Newsletter

Receive top technical news, lesson ideas, travel tips and more!

Invalid email address
Give it a try. You can unsubscribe at any time.

Spread the love
  • 13
  • 23
  • 34
  • 12
  •  
  •  
  •  
  •  
  •  
  •  
    82
    Shares

LEAVE A REPLY

Please enter your comment!
Please enter your name here